A box (sometimes called a node) represents each task, and a line connecting two boxes represents the dependency between the two tasks. The Network Diagram view displays tasks and task dependencies in a network or flowchart format. The NETWORK DIAGRAM which has evolved from the PERT Chart is a diagrammatic view of the tasks where the position of the task and the lines linking them together represent the detailed steps that comprise the project. The term PERT is derived from Programme Evaluation and Review Technique which was invented for the management of Projects by paper based systems. Network Diagrams (the PERT Chart principle) To display the Descriptive Network Diagram view, click the Other Views command on the View tab, select More Views and then select the Descriptive Network Diagram: These larger boxes take up more space, and thus fewer boxes fit on a printed page.įor instructor-led MS Project training in Los Angeles call us on 888.815.0604. The boxes on the Descriptive Network Diagram view are larger and can contain labels for the data elements in the box. The Descriptive Network Diagram view is identical to the Network Diagram view, except for the size, and the detail of the boxes that represent tasks. To see the Network Diagram, on the View tab of the Ribbon click Network Diagram.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |